On May 29, 2014, the U.S. Department of Energy (“DOE”) issued a notice of proposed procedures to change its process of reviewing applications – and making final public interest determinations – on liquefied natural gas (“LNG”) export applications to nations without a Free Trade Agreement (“non-FTA”).
NERC Submits Reliability Standard to Address Physical Grid Protection
On May 23, 2014, the North American Electric Reliability Corporation (“NERC”) submitted a physical security Reliability Standard (CIP-014-1) for FERC approval. The Reliability Standard is designed to increase physical security measures and reduce the Bulk-Power System’s vulnerability to physical attacks.
FERC Allows CAISO to Waive Minimum Performance Threshold for Regulation Providers
On May 19, 2014, FERC granted the California Independent System Operator Corporation’s (“CAISO”) petition for limited waiver of certain sections of its tariff that apply a minimum performance threshold to resources providing regulation services. CAISO had requested the waiver because a significant number of resources were failing to meet the minimum threshold. FERC approved the requested waiver, finding that the waiver was limited in scope, resulted in no undesirable consequences, and benefited customers.
White House Releases Report Detailing President Obama’s Energy Strategy and Highlighting its Successes
On May 29, 2014, the White House released a report, titled “The All-Of-the-Above Energy Strategy as a Path to Sustainable Growth,” wherein the report details the President’s energy approach and the ways in which the U.S. energy sector has changed during the President’s tenure. The report was released just days before the Environmental Protection Agency (“EPA”) is due to announce its new guidelines for limiting carbon dioxide for existing power plants under the Clean Air Act.
DC Circuit Vacates FERC’s Demand Response Rule
On May 23, 2014, the U.S. Court of Appeals for the District of Columbia Circuit (“D.C. Circuit”) vacated FERC Order No. 745, “Demand Response Compensation in Organized Wholesale Energy Markets” in its entirety as an ultra vires agency action, explaining that FERC’s rule overstepped its authority, “encroaching on the states’ exclusive jurisdiction to regulate the retail market.” While the court based its decision on jurisdictional grounds, it said it would have vacated the order on substance also, concluding it was arbitrary and capricious to promulgate rules that over-compensate demand response providers. The panel was split two to one.
White House Announces Plans for Modernizing Infrastructure Permitting
On May 14, 2014, the Interagency Infrastructure Steering Committee released its plan to address permitting for large-scale infrastructure, specifically electric and natural gas projects. The Plan (titled “Implementation Plan for the Presidential Memorandum on Modernizing Infrastructure Permitting”) is designed to reduce the time needed to permit major projects by: (1) streamlining the permitting process at all levels of government; (2) reducing uncertainty in the application process; and (3) enabling hiring of more Federal agency staff. The Plan is a result of the 2013 Presidential Memorandum directing the Steering Committee to develop an implementation plan for permitting reforms.
New England Market Changes Denied as Discriminatory to Storage Technologies
On May 20, 2014, FERC denied proposed changes to the tariff governing the forthcoming ISO New England Inc. (“ISO-NE”) Regulation Market. ISO-NE and the New England Power Pool (“NEPOOL”) Participants Committee (jointly “New England Parties”) are in the final stages of crafting the design for the Regulation Market and anticipated the market being ready to implement as early as May 21, 2014, several months prior to its FERC approved start date of October 2014.
FERC Announces Meeting with NRC Regarding Grid Issues
On May 19, 2014, FERC announced it will hold a joint meeting with the Nuclear Regulatory Commission (“NRC”) on May 28, 2014 to discuss important grid issues affecting both agencies. Commissioners from both FERC and NRC will attend the meeting, along with their respective staffs.
FERC Conditionally Approves PJM’s Non-Public Information Sharing Plan
On May 9, 2014, FERC conditionally approved PJM Interconnection, L.L.C.’s (“PJM”) proposed tariff revisions to enable sharing of operational data with natural gas pipelines and local distribution companies (“LDCs”). The tariff revisions are in accordance with FERC’s Order No. 787 regarding information sharing and allow PJM to share non-public information with pipelines for purposes of operational planning or reliability.
FERC Issues NOPR on Open Access Requirements for Interconnection Facilities
On Thursday, May 15, 2014, FERC issued a Notice of Proposed Rulemaking titled “Open Access and Priority Rights on Interconnection Customer’s Interconnection Facilities” (the “NOPR”). The NOPR proposes to amend certain of FERC’s regulations as they relate to public utilities that are subject to such regulations solely due to owning, controlling or operating generator tie lines, now referred to by FERC as Interconnection Customer’s Interconnection Facilities or “ICIFs.”